I. FABRICATION & MANUFACTURING JOBS

 Grasim Industries Limited, Nagda, Madhya Pradesh

Manufacturing of Complete Column

a) Process Condensate Stripper

Shell ID : 1200 mm

Shell thk: 32 mm

MOC : SA 240TP 304L

Heads- Ellipsoidal Thickness: 29 mm/ 36 mm-SA240 TP304

Internals : 18 tray trays support rings – SA 240 TP 304L

Empty Weight: 29000 kg.

Completion Time: 12 weeks

b) Propylene Tower Condenser

Shell ID : 1702 mm

Shell Thk : 22 mm

MOC : SA516 Gr 70

Channel Heads – 2:1 ellipsoidal thk : 15.5 mm/20.0 mm-SA 516 Gr 70

Tube sheet : 1895 dia x 92 thk, 3730 holes of 19.3 dia- SA 266 cl 2

Straight tubes : 19.5 mm OD x 2.11 mm thk x 6000 mm lg- SA 179

Strength expanded and seal welded

Overall length : 8163 mm

Empty weight : 41500 kg

Completion time : 15 weeks

c) 9 Heat exchangers, MOC-SA 516 Gr.70 for Shell & channel and SA 179 for tubes completed in a record time of 45 days

No. of Tubes : 2480

Complete empty weight of 9 Exchangers: 49500 kg.

Ø Larsen & Toubro Ltd, Hazira, Surat

a) Tube Bundle Fabrication of EO Reactor

Fixed tube sheet Vertical Exchanger

Tube size: 50.8 mm OD x 2.03 mm thk x 12060 mm lg

Tube Sheet: 6275 dia x 360thk

Top and Bottom Tube-sheet SA 765 Gr.2 with Weld overlayed

Overlay thk: 5 mm Alloy

Baffles: Grid Baffles

Tube Bundle Weight: 600 MT

Project No Equipment Material Tubes
E-6101R EO Reactor Duplex SS 8310

b) Tube Bundle Fabrication of EO Reactor

Fixed tube sheet Vertical Exchanger

Tube size: 51 mm OD x 3.4 mm thk x 12800 mm lg- SA 179

Tube Sheet: 6591 dia x 210thk

Top Tube-sheet SA 266 cl 2 and Bottom Tube-sheet overlayed

Overlay thk: 10 mm TP 308L

Tube Bundle Weight: 300 MT

Project No Equipment Material Tubes
10342 A/B EO Reactor Carbon Steel 5001

c) Tube Bundle Fabrication of EO Reactor

Fixed tube sheet Vertical Exchanger

Tube size: 51 mm OD x 3 mm thk x 11854 mm lg- SA 179

Tube Sheet: 6591 dia x 210thk

Top Tube-sheet SA 266 cl 2 and Bottom Tube-sheet overlayed

Overlay thk: 10 mm TP 308L

Baffles: Grid Baffles

Tube Bundle Weight: 550 MT

Project No Equipment Material Tubes
11501 A/B EO Reactor Carbon Steel 6891

d) Tube Bundle Fabrication of EO Reactor

Tube size: 38.1 mm OD x 3.11 mm thk x 6630 lg

Tube MOC: SA 210 Gr. A1

Tube sheet thk: 150 mm

Baffles: Grid Baffles

Tube Bundle weight : 330 MT

Project No Equipment Material Tubes
45274 EO Reactor Carbon Steel 5465

e) Tube Bundle Fabrication of Evaporators for SIDEM

Tube size: 28.6 mm OD x 0.80 mm thk x 8490 lg

Tube MOC: Alumininum Brass

Tube sheet thk: 20 mm

Equipment Material Tubes / cell Cells/unit No. of units
Evaporator Aluminium Brass 11631 6 3

 

f) Tube Bundle Fabrication of Evaporators for SIDEM

Tube size: 28.6 mm OD x 0.80 mm thk x 7440 lg

Tube MOC: Alumininum Brass

Tube sheet thk: 20 mm

Equipment Material Tubes / cell Cells/unit No. of units
Evaporator Aluminium Brass 11631 2 3

g) Tube Bundle Fabrication of Evaporators for SIDEM

Tube size: 28.6 mm OD x 0.80 mm thk x 7440 lg

Tube MOC: Titanium

Tube sheet thk: 20 mm

Equipment Material Tubes / cell Cells/unit No. of units
Evaporator Titanium 1310 2 3

h) Tube Bundle Fabrication of Evaporators for SIDEM

Tube size: 28.6 mm OD x 0.80 mm thk x 8490 lg

Tube MOC: Titanium

Tube sheet thk: 20 mm

Equipment Material Tubes / cell Cells/unit No. of units
Evaporator Titanium 1610 6 3

 

Ø Reliance Industries Ltd, Surat, Gujarat

a) Solvent Condensate Tank

Shell ID : 800 mm

Shell thk : 8 mm

MOC : SA 516 Gr 70

Tan to Tan Distance : 1600 mm

Overall height : 3000 mm

Weight : 1450 kg

Flanges : SA 105

Pipes : SA 106 B x sch 80

b) Seal Oil Reservoir

2000 x 1250 x 800 x 10 thk

MOC : SA 240 TP 304L

c) Lube Oil Reservoir

800 x 400 x 250 x 12 thk

MOC : SA 240 TP 304L

d) Cooling Water Reservoir

900 x 1500 x 12 thk

MOC: SA 516 Gr 70

Overall Height: 2500 mm

e) DTA Condensate Pot

Shell : 1200 ID x 12 thk

Heads : 1200 x 12 thk (min)/ 15 thk (nominal)

MOC : SA 516 Gr.70

Forgings : SA 105

Seamless Pipes : SA 106 B

Tan to Tan distance : 2600 mm

Weight : 1800 kg

 

f) Stripper Chilled Water Exchanger

Floating Tubesheet Heat Exchanger

Shell: 8 inch Sch 60

Tubesheet: 300 dia x 25 thk

MOC: SA 240 TP 304L

Tubes: 15.8 OD x 2 thk x 2000 mm lg

Overall Length: 2650 mm
Weight :800 kg

g) Stripper Condensate Pot

Shell ID : 700 mm

Shell thk : 10 mm

MOC : SA 516 Gr 70

Flanges : 300 thk- Sa 105

Pipes : SA 106 Gr B

Tan to Tan : 1900 mm

Overall length : 2270 mm

Weight : 1250 kg

 

 

 

 

Ø Godrej & Boyce Mfg. Co. Ltd.

a) Fabrication of Heat Exchanger

Overall Length: 8060 mm

Tube Strength welded and lightly expanded.

Project No Equipment Material Tubes Shell Thk
130353 Heat Exchanger Carbon Steel 5070

Finned tubes

18 mm

b) Tube Bundle Fabrication of NPCL jobs

Tube size: 12.6 mm OD x 1.0 mm thk.

Empty weight of all Exchangers equal to 38900 kg.

Project No Equipment Material Tubes Shell Thk
130293, 294, 297, 298, 301, 302, 305, 306 Heat Exchanger Stainless Steel SA240 TP 304 1650/job 16 mm

c) Tube Bundle Fabrication of NPCL jobs

Tube size: 12.6 mm OD x 1.15 mm thk.

Both tube ends welded to tube shell and light expanded

Project No Equipment Material Tubes Shell Thk
130295, 299, 303, 307 Heat Exchanger Stainless Steel 90/job 16 mm

d) Tube Bundle Fabrication of NPCL jobs

Tube size: 12.6 mm OD x 1.15 mm thk.

Project No Equipment Material Tubes Shell Thk
130296, 300, 304, 308 Heat Exchanger Stainless Steel 133/job 16 mm

e) Tube Bundle Fabrication of NPCL jobs

Tube size : 19.05 mm OD x 20 BWG x 6000 mm lg

Tubesheet Thk : 130 mm

Shell MOC : SA-516 Gr.70

Tube sheet MOC : SA-266-2

Tube strength welded and light expanded.

Project No Equipment Material Tubes (U) Shell Thk
130255, 262, 269, 276 Heat Exchanger Stainless Steel 1906/job 14 mm

f) Tube Bundle Fabrication of NPCL jobs

Tube size : 19.05 mm OD x 20 BWG x 8000 mm lg

Tubesheet Thk : 130 mm

Shell MOC : SA-516 Gr.70

Tube sheet MOC : SA-266-2

Tube strength welded and light expanded

Project No Equipment Material Tubes (U) Shell Thk
130225, 263, 270, 277 Heat Exchanger Stainless Steel SA 240 TP308 1157/job 14 mm

g) Tube Bundle Fabrication of NPCL jobs

Tube size : 19.05 mm OD x 20 BWG

Tubesheet Thk : 130 mm

Shell MOC : SA-516 Gr.70

Tube sheet MOC : SA-266-2

Project No Equipment Material Tubes (U) Shell Thk
130257, 264, 270, 277 Heat Exchanger Stainless Steel SA 240 TP308 1094/job 14 mm

h) Tube Bundle Fabrication of NPCL jobs

Tube size : 19.05 mm OD x 20 BWG

Tubesheet Thk : 130 mm

Shell MOC : SA-516 Gr.70

Tube sheet MOC : SA-266-2

Project No Equipment Material Tubes (U) Shell Thk
130258, 265, 272, 279 Heat Exchanger Stainless Steel 1062/job 12 mm

 

i) Tube Bundle Fabrication of NPCL jobs

Tube size : 15.875 mm OD x 20 BWG

Tubesheet Thk : 130 mm

Shell MOC : SA-516 Gr.70

Tube sheet MOC : SA-266-2+ SS-304L

Project No Equipment Material Tubes (U) Shell Thk
130259, 264, 273, 280 Heat Exchanger Stainless Steel 902/job 12 mm

j) Tube Bundle Fabrication of NPCL jobs

Tube size : 15.875 mm OD x 20 BWG

Tubesheet Thk : 130 mm

Shell MOC : SA-516 Gr.70

Tube sheet MOC : SA-266-2

Project No Equipment Material Tubes (U) Shell Thk
130259, 264, 273, 280 Heat Exchanger Stainless Steel 937/job 10 mm

Ø Godrej & Boyce Mfg. Co. Ltd.

Ø Reliance Industries Ltd, Kurkhumb, Pune

a) Fabrication of Suction Dampner

MOC : SA240 TP 304 x 10 thk

Tan line to Tan line Distance : 2217 mm

Overall Length : 3550 mm

Weight : 1705 kg.

Equipment completed in 23 days

b) Fabrication of Lime Solution Tank

Pipe MOC : IS 1239

Plate MOC : IS 2062 Gr B

Equipment completed in 28 working days

Ø Relene Petrochemicals (P) Ltd., Navi Mumbai

a) Fabrication of Heat Exchanger

Tube size : 25 mm OD x 2 mm thk

No of tubes : 158

MOC for tubes, tubesheet, baffles : IS 1002

Shell MOC : A 179

b) Fabrication of Heat Exchanger (E-1145)

Tube size : 19.05 mm OD x 1.65 mm thk x 1050 mm lg

MOC : SS 316L

No of tubes : 155

 

 

 

c) Fabrication of Vinyl Acetate Condenser

No of pipes : 42

Pipe MOC : SA 312 TP 304

Shell MOC : A106

Baffles MOC : A285 Gr C

II. PROJECT JOBS

Ø Reliance Industries Ltd, Surat, Gujarat

Fabrication & Erection of Equipments, Piping & Structural

Total Weight : 224 MT

 

Ø Reliance Industries Ltd, Jamnagar, Gujarat

Fabrication & Erection of Piping & Columns

Total Weight : 185 MT

Ø Reliance Industries Ltd, Kurkhumb, Pune

Fabrication & Erection of Heat Exchangers and Vessels

Total Weight : 38 MT

III. MAINTENANCE JOBS

Ø Reliance Industries Ltd, Surat, Gujarat

a) Insitu Retubing of Heat Exchangers at MEG Plant completed at a record time of 5 days

Tube size: 25.4 mm OD x 16 BWG x 6000 lg

Tube MOC: SS 304L

Shell MOC: SS 304L

No of tubes: 681

Location: 3rd Platform at 19 mtr. Elevation.

b) Retubing of 12 Heat Exchangers at Cracker Plant

The Exchangers were of both U & Straight Bundles

Tube size : 19.05 x 2.11 thk x 6000 mm lg

Tubes were strength expanded & Seal welded

Time of Completion: 8-days/ job

These all jobs were under the jurisdiction of IBR

 

c) Inner row Tube replacement for DRIER at PTA Plant completed in a record time of 4 days.

Tube size : 2 inch x 25 mtr lg.

No. of tubes : 45

MOC : SS 304L sch 160

c) Rewelding of Tube to Tube sheet joints for 12 Heat Exchangers at Cracker Plant.

It is one of the prestigious jobs of its kind on such a record time.

Propylene Condenser (E-555)

Tube size : 19.05 OD x 2.11 mm thk

No. of tubes : 3730/job

Tube sheet Thk : 78 mm

No. of jobs : 6

Completion time : 7 days/job

The tubes were strength welded

Propylene Condenser (E-699)

Tube size : 19.05 OD x 2.11 mm thk

No. of tubes : 3390/job

Tube sheet Thk : 78 mm

No. of jobs : 6

Completion time : 7 days/job

The tubes were strength welded

Ø Reliance Industries Ltd, Jamnagar, Gujarat

Re-tubing of Boiler (ME-RH522-Y07) at Hydrogen Plant

Tube size : 44.5 mm OD x 3.4 mm thk x 7315 mm lg

Tube MOC : SA 213 T11

No. of Tubes : 526

Time of Completion : 11 days

This prestigious job was completed in a record time even though the tubes OD were scaled tremendously thus the tubes were jam-packed. By resorting the latest method we could complete the job in time with perfection.

Re-tubing of 2 Heat Exchangers (371-SO2/371-SO3) at Coker Plant

Tube size : 25.4 mm OD x 2.77 mm thk x 12192 mm lg

Tube MOC : SA 179

No. of Tubes : 3600

Time of Completion : 13 days/job

Re-tubing of 41 Heat Exchangers of Different sizes and materials at VMP Shutdown (October-2005).

SI No Heat Exchanger No Area/Plant Tube Size No Of Tubes Material Of Construction
1 MF-RF414-S02A FCC/PRU ¾” 600 SA 179
2 MF-RF414-S02H FCC/PRU ¾” 600 SA 179
3 ME-RF414-S12A FCC/PRU ¾” 850 SA 179
4 ME-RF422-S04 FCC/PRU ¾” 216 SA 179
5 ME-RF423-S03 FCC/PRU ¾” 90 SA 179
6 ME-RF423-S05 FCC/PRU ¾” 215 SA 179
7 ME-RF424-S08 FCC/PRU ¾” 90 SA 179
8 ME-RF424-S09A-B FCC/PRU ¾” 90 SA 179
9 ME-PP551-E5222B PP 16mm 257 A 179
10 ME-PP551-E5226B PP 16mm 177 A 179
11 ME-PP551-E9507 PP 1” 205 A 179
12 ME-PP551-E5261A PP ¾” 672 SA 333Gr.6
13 ME-PP551-E5261B PP ¾” 672 SA 333Gr.6
14 ME-PP551-E5230C PP ¾” 700 SA 333Gr.6
15 ME-RK372-S09B COKER ¾” 850 SA-179
16 ME-RK372-S10B COKER 1” 700 SA-179
17 ME-RK372-S11B COKER 1” 1400 SA-179
18 ME-AY231-S06 AROMATICS ¾” 1100 SA 179
19 ME-AY231-S07 AROMATICS ¾” 1100 SA 179
20 ME-AY281-S23 AROMATICS 38.1mm 280 SA 179
21 ME-AY221-S15 AROMATICS 38.1mm 280 SA 179
22 ME-RF413-A01 to A03 FCC/RPU 1” 240x3 SA 179
23 ME-RH351-A01 to A16 CRUDE 1” 48 x 16 A 516- Gr.60
24 ME-RH521-Y07 HYDROGEN 44.5mm 100 SA 213 T11

These all jobs were completed successfully with perfection in a short period of 30 days.

Re-tubing of 21 Fin Fan Coolers in position at the site

Tube size : 25.4 mm OD x 3.05 mm thk x 11 mtr.lg

Tube sheet Thk : 25.4

No. of Tubes : 120/job

Time of Completion : 5 days/job

  Relene Petrochemicals (P) Ltd, Navi Mumbai

a) Completed the re-tubing of 39 jobs at a record time of only 4 months

These jobs included different variety of material and different sizes of tubes as under:

SI No Heat Exchanger No Area/Plant Tube Size No Of Tubes Material Of Construction
1 E 7008 Benzene ¾” 370 A-179
2 E 7020 Benzene ¾” 158 A-179
3 E 7024 Benzene ¾” 56 A-179
4 E 6104 A Butadiene ¾” 400 A-179
5 E 6109 A Butadiene ¾” 352 A-179
6 E 2302 EO/EG 1” 390 A-179
7 E 2407 EO/EG ¾” 52 A-179
8 E 1005 A Ethylene ¾” 1764 A-179
9 E 1005 C Ethylene ¾” 1764 A-179
10 E 1008 Ethylene ¾” 210 A-179
11 E 1010 A Ethylene ¾” 910 A-179
12 E 1010 B Ethylene ¾” 910 A-179
13 E 1014 C Ethylene ¾” 292 A-179
14 E 1035 Ethylene ¾” 320 A-179
15 E 1052 B Ethylene ¾” 326 A-179
16 E 1060 B Ethylene ¾” 1434 A-179
17 E 1063 B Ethylene ¾” 216 A-179
18 E 1066 D Ethylene ¾” 1400 A-179
19 E 1066 Ethylene ¾” 1400 A-179
20 E 1072 A Ethylene ¾” 130 A-179
21 E 1078 Ethylene ¾” 50 A-179
22 E 1088 A Ethylene ¾” 102 A-179
23 E 1088 B Ethylene ¾” 102 A-179
24 E 1089 C Ethylene ¾” 224 A-179
25 E 31 E 03 EVA ½” 23 A-179
26 73E04 EVA 20mm 40 SS-321
27 E 4810 Solvents ¾” 1100 A-179
28 E 4208 A Solvents ¾” 450 A-179
29 E 4208 B Solvents ¾” 450 A-179
30 E 4213 A Solvents ¼” 32 A-179
31 E 4213 B Solvents ¼” 32 A-179
32 E 4213 C Solvents ¼” 32 A-179
33 E 4461 Solvents ¾” 822 A-179
34 E 9132 Utility ¾” 84 A-179
35 E 9224 A Utility ¾” 26 A-179
36 E 9224 B Utility ¾” 26 A-179
37 E 9278 /6 Utility 3/8” 140 A-179
38 Ex. Of P 9221 D Utility ¾” 46 A-179
39 E4203 S Solvents ¾” 430 A-179

b) Re-tubing and partial Fabrication of TLX (IBR) jobs.

Tube size : 42.4 mm OD x 4.4 mm thk x 6610 mm.lg

Tube sheet Thk : 210 mm

No. of Tubes : 132

Tube MOC : Cromolithin

Time of Completion : 45 days

Ø Reliance Industries Ltd, Kurkhumb, Pune

a) Re-tubing of 13 Heat Exchangers at site of different sizes.

b) A total no. of 1000 Plugs were welded for Vertical EO Reactor in position at a short span of 5 days.

Plug size : 31 OD x 176 mm lg

Tube size : 38.1 OD x 3.4 mm thk

MOC : SA 179

Ø Oil & Natural Gas Corporation, Hazira, Surat, Gujarat

Re-tubing of LPG Condenser E-703 at CFU-1

Tube size : 19.05 mm OD x 2.11 thk x 8000 lg

Tube MOC : SA 179

Shell MOC : SA 515 Gr60

Tubesheet thk : 45 mm

No. of Tubes : 1281

Ø Kribhco Fertilizers Co., Surat, Gujarat

Re-tubing and Tube to Tubesheet welding of E-25-CO2 Compressor- 1st stage Discharge Cooler

Tube size : 20 mm OD x 2 mm thk

Tube MOC : ASTM A213 TP 304L

No. of Tubes : 1026

Tubes were strength welded.

Ø Gujarat State Electricity Board

Re-tubing and expansion of Condenser unit-III

Tube size : 30 OD x 1 mm thk x 10.1 mtr

Tube MOC : CuNi

No of tubes : 15640

In these tedious job approximately 500 tube were removed per day

i.e. 149 tubes/shift approx (shift of 8 hrs.)

Ø Indian Petrochemicals Corporation Ltd., Nagothane

a) Re-tubing of 30-E-08 & 12(U bundles) at LLDPE Plant

U Tube: 19.05 mm OD x 2.11 thk

No of tube : 164

Tube MOC : A 179

 

b) Re-tubing of Heat Exchanger (15-E-301) at Butene-1 plant

Tube: 25.4 mm OD x 2.5 thk x 6700 lg

No of tubes: 1364

Tube sheet thk : 135 mm

Tube MOC : SA 334

Tubesheet MOC : SA 266 Gr.2

The Tubes were strength expanded and seal welded.

Ø Indian Oil Corporation Limited, Vadodara, Gujarat

Re-tubing of Heat Exchangers (21-E-03A/B)-U bundles

Tube size : 20 mm x 2 mm thk

Tube MOC : SA179

No of tubes : 122

6000 mm length of U tubes and inner 1st five rows stress U bend relieved & PT tested

Tubes strength expanded

Hydro tested to 28 kg/cm2 G

Wt : 12.50 kg each

Insitu Re-tubing of 2 Brass Tube bundles at FCC unit

Tube size : 20 mm x 2 mm thk

Tube MOC : Brass

No of tubes : 2450

 
 

 
 

Canaan

Specialist In : RETUBING, TUBE EXPANSION & TUBE TO TUBE SHEET WELDING WORKS. (ON ALL KINDS OF METALS- ESPECIALLY CS, SS, TITANIUM & DUPLEX)CANAAN ENGINEERING PVT. LTD